Skip to content

Manage Privacy Options

To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions. Cookie Policy

Always active
Functional Always active

The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.

Your consent ID: not set yet

How Do Loss Control Teams Evaluate Water and Wastewater Operations?

  • September 16, 2026
  • 9 min read

Loss control teams evaluate water and wastewater operations by systematically identifying hazards, quantifying risk, and verifying controls across process equipment, chemical handling, confined spaces, electrical systems, and biological exposures. Typical evaluation activities include site inspections, permit-to-work and confined-space audits, process hazard analyses (PHA), lockout/tagout (LOTO) and isolation verification, review of sampling and monitoring data, and assessment of training and contractor management. These assessments focus on points that historically drive incidents and regulatory attention in the sector—chlorine and hypochlorite handling, hydrogen sulfide and methane generation in sewers and tanks, pump and motor mechanical failures, corrosion-related breaches, and human factors that can lead to permit violations or unsafe entry.

This focus matters because failures in water and wastewater operations can trigger OSHA enforcement (including confined-space and hazard communication violations), EPA penalties and NPDES permit noncompliance, costly environmental remediation, and significant workers’ compensation and business interruption costs. Clear, auditable documentation of inspections, corrective actions, training, and monitoring data is essential to demonstrate regulatory compliance and to reduce repeat incidents. Managing these diverse data streams and corrective action workflows at scale is why many loss control programs rely on integrated EHS software; Simple But Needed (SBN) offers a practical platform to centralize inspections, incident tracking, CAPA, confined-space and permit management, and compliance records for water and wastewater operations.

 

 

How do loss control teams evaluate compliance with discharge permits, effluent monitoring, and lab QA/QC practices

Loss control teams begin by mapping the facility’s NPDES/State discharge permit (Clean Water Act, 40 CFR Part 122) to on-site operating parameters: permitted flow (e.g., 5.0 MGD design vs. actual daily average), numeric limits for BOD5 and TSS (mg/L and mass loading kg/day), pH ranges (typical permit bands 6.0–9.0 SU), total residual chlorine (TRC, commonly ≤0.5 mg/L), and ammonia-N limits expressed as monthly averages or seasonal daily maxima. Review includes verifying the permit’s required sample type and frequency — grab vs. 24‑hour flow‑weighted composite — and whether the permit requires daily, weekly, or monthly sampling for each parameter. Regulatory obligations such as records retention for monitoring data and supporting documents (minimum 3 years) are specified in 40 CFR 122.41(l), and many permits require Discharge Monitoring Report (DMR) submission on a monthly cycle (DMR often due within 28 days after the monitoring period end, unless the permit states otherwise). Loss control auditors compare permit language to the plant’s monitoring plan, sample locations (end‑of‑pipe, mixing zone), and the plant’s calculated mass loadings to identify gaps that could lead to off‑permit discharges or reporting violations.

Evaluation of effluent monitoring programs focuses on the sampling plan, sample integrity and representativeness, and operational controls that influence analytical results. For conventional pollutants (BOD5, TSS) the industry standard is 24‑hour flow‑weighted composites collected with appropriately calibrated automatic samplers; field staff should verify samplers are programmed to collect proportional volumes based on instantaneous flow or pulse counts and that automatic samplers’ flow meters receive annual calibration with calibration certificates on file. Field QC (field blanks, equipment rinsate blanks for trace metals, and field duplicates) should be collected at frequencies defined in the permit or QA plan (commonly 1 per 20 samples or 1 per month for routine analytes); acceptable field duplicate relative percent difference (RPD) is typically ≤20% for concentrations above the method reporting limit. Chain‑of‑custody documentation must accompany every sample shipment, and temperature logs for cooled samples must show 0–6 °C at receipt to comply with EPA hold‑time requirements and laboratory standard operating procedures.

Laboratory QA/QC review targets method compliance (40 CFR Part 136 and Standard Methods), laboratory accreditation (ISO/IEC 17025 where required), and routine QC metrics: method blanks, laboratory control samples (LCS), matrix spikes and matrix spike duplicates (MS/MSD), surrogate recoveries, LCS control charts, and duplicate analysis. Typical control limits that loss control reviewers expect to see are surrogate recoveries within ~70–130% (method‑dependent) and duplicate RPDs ≤20% for values above the reporting limit; out‑of‑control trends on LCS control charts must be investigated and documented per the lab’s corrective action procedure. Analysts and samplers must also respect analytical hold times that the permit or method prescribes — for example, bacteriological samples (total coliform/E. coli) are generally analyzed within 6 hours of collection, BOD5 incubations must be initiated within 48 hours, and residual chlorine must be measured on‑site at or immediately after collection — and the lab’s calibration records (daily instrument calibration, multi‑point curves traceable to NIST standards) should be examined for completeness and trending.

To operationalize permit and QA/QC controls, loss control teams use a combination of scheduled audits, split/surrogate sampling, root‑cause analyses, and documented CAPAs tied to permit milestones. Practical audit checkpoints include verification of flow‑weighted composite operation weekly, review of monthly DMRs against lab reports and chain‑of‑custody, trending of key parameters with statistical control limits (showing excursions and corrective actions), and quarterly split samples sent to an independent accredited lab to validate in‑house results. Simple But Needed (SBN) can enforce and document these controls: use the Audits module to store permit clauses and generate exception reports when sample frequency or DMR submissions lapse; the Inspections module to schedule and document sampler calibrations, flow meter checks and chain‑of‑custody verification with photo evidence; Incident Tracking to log permit exceedances and automated notifications to regulators or operations; and the CAPA workflow to assign root‑cause investigations, track corrective actions (e.g., sampler repair, SOP revision), attach lab certificates (ISO/IEC 17025), and close out actions with due dates and verification evidence.

 

How do loss control teams assess confined space entry, atmospheric monitoring, and rescue readiness in treatment facilities

Loss control teams begin by verifying that the facility has correctly classified confined spaces under 29 CFR 1910.146 and that a current space inventory and written permit-entry program exist. Auditors will inspect a sample of active permits to confirm pre-entry procedures (isolation, lockout/tagout per 29 CFR 1910.147, blanking or blinding where feasible) and that permits document initial atmospheric test results performed immediately prior to entry and continuous monitoring where hazards exist. Typical expectations are that each permit lists the entrant, attendant, authorized supervisor, hazard controls, and retrieval equipment; permits should be retained for a period defined by the site (commonly 1–3 years) for audit purposes. SBN’s confined space module and permit templates let teams standardize permit fields, attach LOTO checklists, store permit copies, and maintain an auditable permit history for each space.

For atmospheric monitoring, loss control teams verify instrument selection, calibration and bump-test practices, and recorded exposure limits against regulatory values: oxygen must be maintained between 19.5% and 23.5% for safe entry (1910.146), flammable atmospheres must be below 10% of the LEL before and during entry, and toxic gases such as hydrogen sulfide and carbon monoxide must be below OSHA PELs (H2S ceiling 20 ppm; CO TWA 50 ppm). Teams commonly require a documented bump test before each day’s use and a full calibration at manufacturer-recommended intervals (often every 30 days) with span gases such as 20.9% O2, 50 ppm H2S, 100 ppm CO and an appropriate LEL gas; records of calibration, serial numbers and calibration gas lot numbers should be retained. SBN’s inspections and instrument calibration logs capture bump-test and calibration records, link serial-numbered monitors to confined-space entries, and trigger re-calibration alerts to keep records audit-ready.

Rescue readiness is evaluated against 29 CFR 1910.146(k): loss control teams check whether the employer has made rescue services available (in-house or contract), documented rescue procedures, and ensured rescue equipment suitability for the anticipated hazard (retrieval systems, full‑body harnesses, SCBA for IDLH atmospheres per 29 CFR 1910.134). Auditors expect evidence of periodic drills—industry practice is at least annual full-scale rescue drills and more frequent tabletop reviews; drill records should include response times, equipment function checks, and corrective actions. Teams confirm written MOUs with offsite rescue providers are current and that on‑site rescue teams maintain documented competencies in rope rescue and confined-space systems consistent with NFPA 1670/1006-based training. SBN’s incident-tracking and drills functionality lets teams schedule and record rescue drills, time-stamp response metrics, attach MOU documents, and open CAPA items automatically when drill performance falls short.

Finally, loss control teams assess program performance through scheduled audits, trending, and corrective-action closure: common practice is quarterly permit audits and an annual confined-space program review that includes checklist verification for training matrices, instrument calibration compliance, rescue drill histories, and integration with energy-isolation (LOTO) programs (29 CFR 1910.147). Deficiencies should feed a CAPA workflow with assigned owners, target close dates (typical corrective-action SLAs are 30–90 days depending on severity), and verification steps; auditors will also sample past incident investigations to confirm root‑cause analysis and recurrence prevention. SBN operationalizes this by combining audits, inspections, CAPA and training matrices—automatic inspection scheduling, one-click CAPA creation from audit findings, LOTO checklist linkage, and training expiry alerts ensure corrective items are tracked to closure and program changes are versioned.

 

How do loss control teams audit chemical management for chlorination, coagulants, and sludge handling including storage and dosing systems

Loss-control evaluations begin with the regulatory and process-safety framework: chlorine gas and bulk hypochlorite systems commonly fall under OSHA Process Safety Management (29 CFR 1910.119) and EPA Risk Management Plan requirements (40 CFR Part 68) when stored or used above the rule’s threshold quantities, while hazardous-waste and sludge cleanup operations trigger HAZWOPER (29 CFR 1910.120). Auditors verify that Process Safety Information (PSI) required by 1910.119(e) is current — material hazard data, process flow diagrams, and design basis for scrubbers/neutralization — and that hazard communication (29 CFR 1910.1200) SDSs are accessible and employees receive initial and refresher training tied to permit and PSM cycles (training and competency documentation typically reviewed annually). Loss-control teams also check that laboratories and field tests follow approved methods (Standard Methods or 40 CFR Part 136 where applicable) for residual chlorine, total residual oxidant, and polymer dosage verification, and that QA/QC records (blanks, spikes, calibrations) are retained for the permit-required retention period. SBN’s chemical inventory and audit modules centralize PSI, SDS linkage, and training records so teams can demonstrate regulatory compliance and schedule annual refreshers.

Audits of physical storage focus on segregation, containment, and engineered safeguards: compressed-gas chlorine cylinders and ton containers must be stored upright, secured, in a cool, well-ventilated room with automatic ventilation and leak detection, and separated from incompatible materials; bulk sodium hypochlorite (commonly 10–15% available chlorine for municipal use) should be in HDPE or FRP tanks with UV-protective covers, temperature control where feasible (<25 °C to slow decomposition), and secondary containment sized to at least the volume of the largest tank or per owner/operator risk criteria. Inspection schedules for level sensors, venting, interstitial monitoring, and corrosion-prone metallic fittings are typically quarterly; relief devices and scrubber systems should have documented annual functional tests. Loss-control teams also verify emergency neutralization capacity and that neutralizer chemicals (e.g., sodium bisulfite) are stored with sufficient on-site inventory to meet modelled release response. Field and routine physical checks are best captured with digitized checklists — SBN’s inspection workflows and mobile inspection software streamline recurring tank and cylinder inspections and keep timestamped evidence for audits. SBN inspection software supports recurring checklists, photo attachments, and corrective-action creation tied to specific storage assets.

Dosing, metering, and feed-system audits concentrate on mechanical integrity, redundancy, and control-system interlocks: metering pumps (peristaltic or diaphragm) used for chlorination and polymer feed should have redundant duty/standby units, routine calibration (flow verification) at intervals consistent with plant criticality — commonly monthly functional checks and annual NIST-traceable calibration — and automatic dose modulation linked to continuous residual analyzers with documented calibration and span checks. Loss-control teams look for pressure/vacuum relief and vacuum breaks on gas feed lines, backflow prevention, and fail-safe shutdowns that isolate chemical feed on analyzer loss or out-of-range conditions; they also confirm maintenance activities use documented LOTO procedures per 29 CFR 1910.147 when servicing pumps or valves. For polymer make-up and sludge conditioning, auditors verify mix-times, dilution ratios (typical polymer make-up 0.5–1.5% active solution), and age limits on prepared polymer (often discarded after 24–48 hours to avoid loss of performance). SBN’s LOTO and asset-management features let teams assign LOTO procedures to specific pumps and valves, track pump calibrations and service intervals, and tie metering-pump maintenance history to criticality rankings.

Sludge-chemical handling and contractor controls bridge occupational exposure and environmental risk: polymer and coagulant bulk transfer operations expose workers to inhalation and dermal hazards and to confined-space entries for tanks and digesters governed by 29 CFR 1910.146; auditors confirm atmospheric testing before and during entry (oxygen, LEL, H2S/CO where applicable), rescue plans, and annual confined-space training and drills. Sludge dewatering chemicals (polymers, ferric chloride, alum) require SDS-driven PPE, eyewash/quick-drench capability within 10 seconds travel time, and inhalation controls — local exhaust for powder polymer feed and splash guards for liquid dosing. Loss-control reviews also verify contractor hot-work, tank-cleaning and confined-space procedures, and that incident investigation and CAPA timelines meet internal policy (e.g., 24‑ to 72‑hour initial notification, root-cause within 30 days). SBN helps operationalize these controls by tying confined-space permits, JHAs, incident tracking, and CAPA tasks together so teams can schedule atmospheric retests, record rescue-ready status, and document contractor qualifications in the same compliance workflow.

 

How do loss control teams evaluate mechanical integrity, preventive maintenance, and criticality ranking for pumps, valves, clarifiers, and tanks

Loss control teams begin mechanical integrity (MI) evaluations by verifying written programs, inspection records, and testing frequencies against applicable regulatory drivers; where a process involves OSHA-regulated hazardous chemicals that meet the PSM threshold, 29 C.F.R. 1910.119(l) requires a documented MI program that includes written procedures, inspection and testing, and quality assurance. Typical field verifications include reviewing ultrasonic thickness (UT) logs for tanks and clarifier rails (intervals commonly annual or based on measured corrosion rate, with API 653 guidance used for aboveground storage tanks to set internal inspection intervals), pump vibration baselines and trending (establishing a baseline on install and quarterly spectrum captures thereafter), and mechanical seal leakage records (noting flush rate, seal chamber pressures and observed leakage quantified as mL/hr). Inspectors look for evidence of adherence to vendor OEM intervals (e.g., coupling alignment at installation and after every repair, bearing lubrication every 250–1,000 operating hours depending on manufacturer) and ensure PM tasks generate measurable acceptance criteria (UT thickness limits, acceptable bearing temperature rise—generally a bearing temp rise >10–20 °F above running baseline triggers investigation).

Preventive maintenance programs are evaluated against both calendar- and condition-based triggers to reduce reactive failures. For pumps, a defensible PM program typically includes monthly visual checks, quarterly vibration and thermography scans, and an annual seal and bearing inspection/overhaul; teams compare these intervals to actual failure modes — for example centrifugal pump bearing failures that commonly show progressive vibration increase over 3–12 months, warrant quarterly vibration trending and immediate alarm thresholds (ISO 10816/ISO 7919-based velocity bands or vendor-specific limits). Valves receive monthly stroke/exercise where service-critical (process isolation valves protecting a discharge permit or safety barrier), with seat leakage testing or bench-testing at least annually for control/critical isolation valves; stuck valves are a frequent contributor to permit excursions and should have an exercising frequency tied to observed failure rates rather than a pure calendar interval. Preventive metrics audited include PM completion rate targets (industry practice is ≥95% on-time completion), mean time between failures (MTBF) trending, and backlog age (targets often <30 days), with escalation when KPIs fall below thresholds. Criticality ranking translates inspection and PM data into risk-based priorities so limited resources protect the highest-consequence assets first. Loss control teams use a risk matrix (consequence × likelihood × detectability) scoring on 1–5 scales — for example, consequence categories include safety (potential for injury/fatality), environmental (potential for NPDES permit exceedance such as a permit limit exceedance within 4 hours of asset failure), and operational (loss of treatment capacity measured in MGD). A pump that, on failure, can allow bypass of untreated flow and cause an instantaneous permit exceedance might score consequence = 5, likelihood based on historical MTBF (e.g., centrifugal pump bearings historically failing every 3–5 years might be likelihood = 3), and detectability based on monitoring (real‑time vibration trending = 1). Assets scoring at or above a defined threshold (commonly ≥12 of 15) are classified “critical” and get redundancy, shorter PM intervals, condition monitoring (online vibration/thermography), and dedicated spare parts with lead-time calculations (critical spare motor or seal kit reorder point set to cover 8–16 week procurement lead times plus safety stock). Simple But Needed (SBN) supports operationalizing these programs by mapping asset criticality to tangible workflows: the SBN inspections module can host pump, valve, clarifier, and tank PM checklists (with OEM-prescribed frequencies), accept uploaded vibration and UT readings to an asset record, and flag out‑of‑tolerance measurements to create a CAPA. The LOTO and JHA features link required isolation steps to specific PM work orders so compliance with 29 C.F.R. 1910.147 and 1910.119(l) is documented; the audits and incident-tracking modules capture failures leading to MTBF calculations and trigger reassessment of criticality scores, while parts-inventory tracking aligns spare-levels to the criticality ranking and lead-time fields so procurement holds the correct spare pump cartridges or seal kits for assets scored as critical.

 

How do loss control teams verify emergency response, spill containment, contractor coordination, and training for wastewater incidents

Loss control audits begin by confirming the written emergency action and response plans required by OSHA 29 CFR 1910.38 and the hazardous release response provisions of 29 CFR 1910.120(q). Reviewers verify that the plan identifies alarm/notification chains, on‑scene incident command roles and minimum mobilization times — many utilities set internal mobilization targets of staffed response within 15 minutes and on‑scene control within 30 minutes for foreseeable releases. Documentation reviewed includes drill schedules and reports (tabletop at least annually, full‑scale exercises at least every 12 months when hazardous chemicals like chlorine are present), after‑action reports with time‑stamped response metrics, and written mutual‑aid or local fire department agreements that define responder roles and pre‑assigned ICS positions. Where PSM or RMP applies (chlorine ton containers or other PSM‑threshold chemicals under 29 CFR 1910.119 and 40 CFR Part 68), loss control confirms the emergency plan incorporates offsite consequence mitigation measures and notification sequences required by those programs.

Spill containment verification focuses on engineered and administrative controls and measurable capacities. Inspectors confirm secondary containment sizing consistent with EPA SPCC practice (secondary containment sized to hold 110% of the largest tank or the capacity prescribed by site design for liquid chemical storage under 40 CFR 112.7), functioning isolation valves with quarterly operation logs, and spill kits staged to anticipated release volumes (typical municipal kits include 50–100 linear feet of boom and 100–200 kg of absorbents per major chemical storage area). For chlorine and dechlorination response, loss control reviews dechlorination systems’ hydraulic capacity and chemical stock to ensure capability to lower free chlorine below common NPDES permit limits (often ≤0.1 mg/L) at design bypass flow; they verify monthly mass‑balance checks, annual bench tests of neutralization reagents, and calibration logs for dosing pumps to ±5% of setpoint. Instrumentation checks include monthly functional tests of automatic shutoffs, weekly testing of audible/visual alarms, and calibration records for chlorine detectors and area monitors to ensure sensor drift is corrected within manufacturer tolerances.

Contractor coordination and training records are a frequent finding area; loss control teams verify pre‑qualification, site orientation, and task‑specific JHAs before contractors begin work. Auditors require documented contractor orientation that covers site‑specific hazards, emergency procedures per 29 CFR 1910.38, and lockout/tagout expectations under 29 CFR 1910.147; where contractors perform confined‑space entry or hot work they must provide evidence of training to the levels required by 29 CFR 1910.146 (confined space) and applicable construction standards (29 CFR 1926), plus copies of contractor rescue agreements if internal rescue capability is not provided. Records should show contractors’ HAZWOPER training status when they will respond to or be exposed to hazardous substance releases (many utilities require contractor responders to have the same 40‑hour/8‑hour refresher baseline used for facility responders when performing response tasks). Loss control teams also spot‑check mobile contractor equipment (portable dechlorination units, booms, pumps) for maintenance tags and verify contractor emergency contact lists and two‑way radio interoperability with plant communications.

To operationalize findings and maintain continuous improvement, loss control teams use SBN to centralize incident records, corrective actions, and verification evidence. The incident‑tracking module timestamps reported spills, records initial mobilization versus target times, and links to photographic evidence from the scene; the CAPA workflow creates and assigns corrective actions from after‑action reports with due dates and verification checklists. The audits and inspections module schedules and documents tabletop and full‑scale exercises, stores attendance rosters, and retains drill AARs; the chemical inventory feature flags PSM/RMP threshold quantities for chlorine so emergency plans and annual exercises are automatically triggered. For contractor oversight, SBN’s JHA and contractor document repository holds orientation sign‑offs, training certificates, equipment inspection tags, and pre‑qualification scores, enabling reviewers to pull a single audit report that demonstrates compliance with 29 CFR 1910.38, 1910.120, 1910.146, and applicable PSM/RMP elements.

 

 

Frequently Asked Questions

 

How do loss control teams verify NPDES permit compliance, effluent monitoring, and DMR accuracy?

Teams map permit limits (40 CFR Part 122) to on-site parameters, confirm sample type/frequency (e.g., 24‑hour flow‑weighted composites for BOD/TSS), check chain‑of‑custody, temperature logs (0–6 °C), and DMR submittals (typically monthly, often due within 28 days) against lab reports and hold‑time requirements (e.g., bacteriological ≤6 hrs, BOD5 ≤48 hrs). Audits target field QC (duplicates, blanks at common frequencies ~1 per 20 samples), ISO/IEC 17025 or 40 CFR Part 136 method compliance, and documented corrective actions for excursions; SBN helps by using the Audits module to store permit clauses and generate exception reports, the Inspections module to log sampler calibrations and chain‑of‑custody evidence, Incident Tracking for permit exceedances, and CAPA to assign and document corrective actions and attach lab certificates.

How do loss control teams assess confined‑space entry, atmospheric monitoring, and rescue readiness in treatment plants?

Assessments verify compliance with 29 CFR 1910.146 through a current space inventory and permit program, confirm pre‑entry isolation and LOTO per 29 CFR 1910.147, and check atmospheric testing against limits (O2 19.5–23.5%, flammables <10% LEL, H2S ceiling 20 ppm, CO TWA 50 ppm) with documented bump tests and recurring calibrations (commonly daily bump and full calibration ~30 days). Rescue readiness is evaluated per 29 CFR 1910.146(k) for written MOU’s or internal teams, documented annual full‑scale drills and time‑stamped response metrics, and proof of SCBA/ retrieval equipment and training (NFPA 1670/1006); SBN helps by storing permit histories and LOTO checklists in the Confined Space module, tracking instrument bump‑test/calibration logs, scheduling and recording drills with Incident Tracking, and opening CAPA items for drill deficiencies.

What do auditors look for when evaluating chlorine/chlorite chemical management and dosing systems for PSM/RMP exposure?

Auditors confirm applicability to PSM (29 CFR 1910.119) and RMP (40 CFR Part 68) thresholds, verify current Process Safety Information, appropriate engineered safeguards (secured storage, ventilation, leak detection), secondary containment (SPCC guidance such as 110% of largest tank), and annual functional tests of scrubbers/relief devices; they also check temperature control for hypochlorite (<~25 °C), segregation, and emergency neutralizer capacity. Feed‑system checks include redundant metering pumps, monthly functional checks and annual NIST‑traceable calibrations, fail‑safe interlocks, and documented LOTO during maintenance; SBN aids teams by centralizing PSI and SDS in the Chemical Inventory, scheduling tank and cylinder Inspections, tracking metering pump calibrations in Asset/Inspections, and linking LOTO procedures to specific assets for audit trails.

How do loss control teams evaluate mechanical integrity, preventive maintenance, and criticality ranking for pumps, valves, clarifiers, and tanks?

Teams require a written MI program where PSM applies (29 CFR 1910.119(l)), review UT thickness logs and corrosion‑based inspection intervals (API 653 guidance), vibration baselines and trending, seal leakage records, and PM completion metrics (industry targets ≥95% on‑time) with backlog age controls (commonly <30 days). Assets are risk‑ranked using consequence × likelihood × detectability (1–5 scale) with critical thresholds (commonly ≥12/15) to assign redundancy, shortened PM intervals, online condition monitoring, and spare‑parts levels; SBN operationalizes this by storing PM checklists and OEM intervals in Inspections, recording UT/vibration results on asset records, auto‑creating CAPAs for out‑of‑tolerance readings, linking LOTO procedures to work orders, and aligning parts‑inventory to criticality scores.

 

Simple But Needed (SBN) is a global EHS platform that provides industries such as Oil & Gas, Insurance, Government and Public Entities, Utilities, Pharma and Biotech Laboratories, Education, Manufacturing, Food and Beverage, Healthcare and Construction with a simple yet powerful tool to manage all of their EHS needs. We handle Inspections, LOTO procedures, complex Chemical Asset Inventory, Ergonomics, JHAs, Safety Walkthroughs, Asset Inventory, Confined Space, Fire and General Safety, Toolbox Talks, Training and Certification tracking, CAPA, Near Miss and Incident Management, Epermitting, Safety Observations, Compliance and more. We offer sophisticated dashboarding and reporting capabilities with the push of a button.

 

See why teams choose SBN

Inspections, corrective actions, audits and compliance — made simple, easy and effective. Start a free trial and see it in your own workflow.

Start your free trial